CAIN-42 MCPGate

AGENTIC AI 75 · #44

Evidence-based construction change orders

Trimble described agents drafting potential change orders from contracts, drawings and project records.

Last reviewed 2026-11-11

Agentic AI 75 / #44

PROPOSEDMoat 4 · Execution Provenance & AttestationBundle · Physical & LabStream 4

2026 status: Product announcement · Category: Construction

The 2026 development

Trimble described agents drafting potential change orders from contracts, drawings and project records.

The governance gap

A change order is a financial and contractual instrument. The agent's draft must show which clause, drawing revision and record supports each line, and a human must own the approval.

Where CAIN-42 fits: Moat 4 — Execution Provenance & Attestation

Core question: Can we prove what actually happened? Hash-chained, signed records binding decision to execution to observable effect.

Build the change order as an evidence-backed claim: each line cites a document, a revision and a reviewer. The signed package preserves the source hashes and the approval chain.

How the wiring works

  1. Extract each line item and cite its source document and revision.
  2. Flag unsupported or conflicting citations.
  3. Require a human reviewer for each financial line.
  4. Sign the package and preserve the source hashes.

What is real today

PROPOSED A design mapping only. No dedicated implementation exists yet; do not buy this as a finished control.

No contract or drawing ingestion exists in this repository. Do not treat this page as legal or contractual advice.

Component in this repositoryWhat the module says it is
cain/worm_export.pyCAIN Trust Fabric - tamper-evident WORM Causal Evidence Fabric (Phase 4)
cain/causality/graph.pyCAIN CAUSALITY — Causal Event Graph (Prompt CAUSALITY, Phase 3).
cain/compliance.pyCAIN Trust Fabric - Regulatory Compliance & Certification Engine (Phase 4)

Descriptions are the first line of each module's own docstring, read without importing it. A module path is a pointer into this repository, not a hosted endpoint. Its existence is checked by the test suite; its status for this use is the label above.

Check it yourself

Commercial package

OfferContract Evidence Review
BuyerConstruction and legal operations teams
Price (proposal)$7,500–$15,000 per engagement
BundlePhysical & Lab — A validity check between the plan and the machine.
Operator streamStream 4 of the 10-stream operator playbook

Lab automation, robotics, industrial operations, construction technology is the bundle buyer. The entry offer for this bundle is Physical-action assurance review (advisory, simulation-first); the range is $5,000–$15,000 per engagement. A price on this page is a proposal, not a validated rate, and no customer is claimed.

Buy this as a product or service

CAIN-A75-044 — Contract Evidence Review DELIVERABLE

A bounded engine run on the buyer's sample: findings, a written report, and a SHA-256 artifact manifest. The manifest is unsigned: it is not a signature and not an attestation.

Kind: Evidence Pack · Price (proposal): $7,500–$15,000 per engagement · Lead time: 5 business days.

Open the product page · all 75 products

What this page does not claim

What this page is not. CAIN-42 is not affiliated with, endorsed by, integrated into, or shipped with the organisation named in the 2026 item. The item is public context; the page describes how CAIN-42 would govern that class of capability. No page here claims a customer, a partnership, a certification, a patent, or a production integration. Prices are proposals. Built by a three-person team.

← #43 Agentic construction schedulingAll 75#45 IT investigation with approval-gated remediation →